Manjushri

joined 11 months ago
[–] Manjushri@piefed.social 1 points 3 hours ago

I used to think this was a bad idea because while objective numbers are great, it can be difficult to apply it to real life.

If you aren't going to measure how much you're eating, then neither form of label matters.

[–] Manjushri@piefed.social 3 points 1 day ago

OPs article links to another article at TechCrunch . That article states:

As first reported by The Verge, the new Wi-Fi Motion feature works for advanced Xfinity gateways XB7 and newer models and is opt-in, which means users can choose whether to switch on the feature in the Xfinity app.

So it seems like for now it's only this one model that can do it, if you believe them. Frankly, I wouldn't sniff that opt-in claim either because I'm fairly certain I know which orifice they pulled it out of.

[–] Manjushri@piefed.social 1 points 2 days ago

I use all the features available to me, but my adaptive cruise control likes to slam on the breaks when a car in the turning lane next to me brakes to make their turn. Particularly on curves and the sensors decide the car in that lane is actually in front of me. It happens so often that I've come to expect it. Some safety features are just not ready for prime time.

[–] Manjushri@piefed.social 10 points 6 days ago

I agree. If you use a gun to kill someone, then you are the killer, not the gun. If you use an AI to lie in court, then you are the liar, not the AI, and you should be charged accordingly. The AI, like the gun, is just the tool used by a person to commit the crime.

[–] Manjushri@piefed.social 2 points 1 week ago (1 children)

Fascinating. After reading your post I went back and tried it. When I tap Reader Mode, it switches over fro just a second or so and then switches back to the regular page. I've never seen that before.

[–] Manjushri@piefed.social 2 points 1 week ago* (last edited 1 week ago) (1 children)

To paraphrase a commenter under that video; If you told me in 1985 that this song would bring a tear to my eye in 2026, I would have laughed at you, but here we are.

[–] Manjushri@piefed.social 8 points 2 weeks ago

but oh boy was I fucking pissed.

Sounds like you're still fucking pissed. Good for you. You should still be pissed.

[–] Manjushri@piefed.social 2 points 2 weeks ago

Lol. Those flock cameras must be sending out a recognizable signal, right? Link this to a detector and it could automatically hide your plate when a camera is in range and then flip it back when. You leave range.

[–] Manjushri@piefed.social 3 points 2 weeks ago (1 children)

I concede that my grasp of the scale involved was unrealistic. However, I don't see a viable solution. The issue, I have realized, isn't how to generate the power, it's the scale of power needed to run these data center monstrosities.

As you say, 7.65 gigawatts is a lot of power. According to ERCOT, Texas just set a new record for power demand in July of 91gw. So this plant, built to supply this one data center complex, will produce power equal to 8.5% as much power as the entire state of Texas required at peak demand this year (so far, anyway). 8.5% of peak demand for the entire state of Texas which, by the way, is the largest energy consuming state. Texas uses about 15% of the total power generated in the entire USA according to EAI.gov.

So if solar and wind (with batteries, of course) would be very challenging, it is at least vaguely possible. Texas is a great state for wind, solar, and geothermal power. It already generates about 30% of it's power from renewables. Texas has a lot of sunny days and a lot of open spaces for wind farms particularly in the western parts of the state. I can think of worse ideas than covering all those oil fields with solar panels or wind farms. You wouldn't even need to stop producing oil. You can do both.

Nuclear really isn't viable. Starting the approval process now, it would easily be 20 years before a new plant would start producing power. No one is waiting two decades to open their data center.

The only other option to power these data centers, the one they are going with, is fossil fuels. That means multiplying the amount of toxic and greenhouse gasses being pumped into our air which is the absolute worst option for everyone on the planet.

[–] Manjushri@piefed.social 1 points 2 weeks ago

You're not wrong. One of the newest reactors to come on line is reactor 3 at Plant Vogtle in GA. After as much as 5 years for the approval process, the reactor broke ground in 2009 and didn't start producing power until 2023. That's just shy of 2 decades from start to finish. As much as my wind and solar idea is flawed, nuclear is as much of a non-starter. These folks may want to open their data center a little sooner than 2045.

[–] Manjushri@piefed.social 10 points 2 weeks ago (2 children)

Be careful about that too. You never know who's listening. There was a student teacher who sent a private snapchat to her boyfriend and roommates where she joked about shooting up the school. Within hours the message had been forwarded by meta to the FBI and sheriffs officers were at the school talking to her.

[–] Manjushri@piefed.social 111 points 2 weeks ago (5 children)

Some government leaders signed nondisclosure agreements early in the process

How can this be even remotely legal. You work for the public you cannot reasonably be held to an NDA that requires you to not tell your BOSS what you're fucking doing!

view more: next ›