this post was submitted on 26 Jun 2026
518 points (99.1% liked)

Technology

87575 readers
3642 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


founded 3 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] Brkdncr@lemmy.world 64 points 2 months ago (35 children)

It’s pretty easy to regulate this:

  • Closed loop cooling
  • grid upgrade built into design plans, paid for by the datacenter.
  • cleaner power generation
[–] Psionicsickness@reddthat.com 0 points 2 months ago (13 children)

Closed loop is absolutely the right answer, and easily regulated.

As to your other two points, the answer is obvious. Nuclear.

[–] Brkdncr@lemmy.world 4 points 2 months ago (12 children)

It doesn’t need to be nukes. Hydro, solar, wind, and any other mix of power sources is fine, including fossil fuels as an alternative should it be a cloudy, windless week.

[–] Psionicsickness@reddthat.com -2 points 2 months ago (1 children)

Hydro is limited by geography, and wind and solar requires a metric fuck ton of oil to produce and replace at EOL. You want clean, you want nukes.

[–] Mondez@lemdro.id 2 points 2 months ago (1 children)

You say that like building a nuclear plant won't require the metric fuckton of oil to build and replace at eol.

[–] Psionicsickness@reddthat.com 2 points 1 month ago

EOL for a nuke plant in measured in centuries. Refueling measured in decades. Wind turbines have end of life somewhere between 5 and 10 years.

load more comments (10 replies)
load more comments (10 replies)
load more comments (31 replies)